Favorites

Arnhem

Accsys Technologies

Project details

Contractor:
Bruil Bouw, Ede - NL

Year:
2017

Developer:
Accsys Technologies

Accsys Technologies new production location in Arnhem with high performance concrete facade panels installed on the building. The installation of the 14 elements was completed in September. 

 

Hi-Con NL and Bruil Prefab has supplied the project with 14 facade elements in nine variations and with a total area of 165 m2 in CRC i2® high performance concrete. The elements measure 3200 mm in height.   

Downloads

No downloads

Contact

Share your dreams with us about spectacular designs and innovative products for your next building project. New builds or renovations.

Michael Uhrenholt
Group Project Development Manager

+45 +45 60 22 49 53