Favorites

Copenhagen, DK

Metropolis

Project details

Contractor:
KPC Byg

Year:
2006

Architect:
Kasper Danielsen A/S

Hi-Con supplied the project with 88 balconies on the west side and 176 balconies on the east side of the building.

 

Balconies west side:

The balconies are cantilevered and the thickness of the balconies varies between 85-105 mm.

Balconies east side:

On the east side, the balconies consists of five different element types. Three types used for the cantilevered part with a steel construction that supports the balconies and reduces the cantilevered length of the balconies. Hi-Con has supplied 176 balconies on the east side of the building. The other two baloconies are designed as two-sided, supported and inside lying corner balconies that are carried by knots. 

 

 

Downloads

No downloads

Contact

Share your dreams with us about spectacular designs and innovative products for your next building project. New builds or renovations.

Michael Uhrenholt
Group Project Development Manager

+45 +45 60 22 49 53