Skip to main content

Staircase in UHPC

Aarhus Train Station

Aarhus Train Station

Built Year

2004

Architect

EXNERS TEGNESTUE A/S

Contractor

Ejner Kornerup A/S

Engineer

Just Cosult - AArhus

In 2004, Hi-Con supplied Aarhus Train Station with steps and landings for a three floot staircase.

Furthermore, Hi-Con supplied three landings for an outside flight, 6 landings with integrated beams and 63 steps to be installed in either the wall or the central beam. Hi-Con also supplied three identical footbridge panels.

Both staircase and footbridge are carried by a steel wire system.  

Don't be shy

Do you need more information?
Let's get in touch

Contact